In 2008 Trakia-RM Ltd. purchased a drilling rig machine BAUER BG 28 H with the following parameters:
СЕ certificate;
Output capacity power 354 KW;
Kelly BK 28/419/3/33 I;
Hydraulic hammer for metal pilots FAMBO HR 7000;
The machine can drill at the following diameters: without casing walls Ø 520 and Ø 720, with casing walls Ø 620 and Ø 820. The company offers its clients complex solutions for pile constructions which are applicable in the following areas:
Construction of foundations for tall buildings and heavy installations under complex geological conditions –
disjoined soils, soils with high water content and in swamp areas;
Reinforcement of landslides in close proximity of roads, rivers, and in populated areas;
Confining of underground spaces in densely populated urban areas, underground parking areas, metro stations;
MULTIFUNCTIONAL TRADE ENTERTAINING COMPLEX "MALL ROUSSE"
Pile foundation of construction site. Foundation is made by pile constructions with diameter of 800 mm and depth
of 26 to 31.30 meters.